ERTMS Level 1 & Level 2 in RENFE Conventional Lines
  - Specifications Version 2.2.2
Albacete - Villar de Chinchilla
  - 40 Km double track - 220 Km/h.
  - (4 x 252 locomotive) & (1 x 490 Alaris train).
Objectives
  - Verification of the ERTMS Interoperability Class 1.
  - Verification of the Interoperability with the National Systems (ASFA, EBICAB 900 TBS).
  - Verification of National Functions.
  - Produce Formal procedures for System Verification, Validation and Acceptance.
ERTMS Level 1 Contract
  - INVENSYS DIMETRONIC:
    Eurocab: Kernel, TIU, Odometer, DMI, Euroradio FFFIS (with GSM-R interface), STM FFFIS, JRU
    ASFA STM, EBICAB 900 TBS STM: FFFIS STM
  - BOMBARDIER:
    LEU, Eurobalises, BTM (with K interface).
ERTMS Level 2 Contract
  - Train: Idem Level 1
  - INVENSYS DIMETRONIC:
    RBC (Euroradio FFFIS), Interlocking, CCE, Fixed Eurobalises
  - SIEMENS:
    GSM-R Communications